
- Top built quality with CE-certificate
- Manufactured according to ISO 9001
- CE-Stop and signal sound during the final lowering phase
- Twin-hydraulic-cylinders on both sides
- Hydraulic synchronization (following concept)
- Autom. safety-lock and unlock
- No connection between both platforms
- Tip-lever-system for strong lifting
- Top qualitiy and massive construcion
- Signal sound (foot protection)
- Emergency lowering
Lifting capacity
3000 kg
Max lifting height
1870 mm
Low lifting point
110 mm
Lifting/lowering time
45/30 sec.
Power supply
400V / 3 Phasen
Motor power
2,2 kW
Fusing
16 A
Weight (approx.)
960 kg
